research-document FE-BND-CARD-A08

A08

A08

  • Input: A framework-like artifact, evidence, uses, failures, and constraints.
  • Operation: Sequence characterization, comparison, minimal redesign, implementation test, and reassessment while carrying trace links forward.
  • Output: Tested, versioned redesign with decision history.
  • Scope conditions: Artifacts that are inspectable, modifiable, and testable.
  • Failure conditions: A stage is skipped; evidence links break; comparison baseline is weak; tests are not prospective.
  • Predicted effect: The bundle may reduce late rework beyond the sum of individual stages.
  • Measurement: Rework time, defect escape, and interaction contrast in a factorial study.
  • Implementation test: Independently execute all stages from frozen inputs.
  • Decision rights: Stage owners propose; artifact owner accepts.
  • Uncertainty handling: Unresolved findings carry forward.
  • Verification: Stage gates and final outcome test.
  • Provenance: End-to-end lineage.
  • Implementation cost: Highest of the candidate set.
  • Limitations: No explicit interaction form or directional factorial contrast exists; therefore H2 audit fails. Direct: sequence. Inference: possible interaction.