research-document FE-BND-CARD-B01
B01
B01
- Input: Project situation, goals, constraints, reusable method fragments, roles, and work products.
- Operation: Select, configure, compose, and adapt method fragments to the situation using an explicit methodology metamodel.
- Output: A situation-specific method with process, people, modeling, and work-product definitions.
- Scope conditions: Information-intensive development and change work.
- Failure conditions: Situation factors are wrong; fragments do not compose; tailoring loses required controls.
- Predicted effect: Better situational fit than using a fixed method.
- Measurement: Requirement coverage, conformance, effort, and project outcomes.
- Implementation test: A separate engineer constructs a method from the same fragments and situation constraints.
- Decision rights: Method engineer proposes; project authority accepts tailoring.
- Uncertainty handling: Alternative configurations may be retained.
- Verification: Metamodel conformance and project review.
- Provenance: Fragment-to-method links.
- Implementation cost: Repository, modeling, and tailoring expertise.
- Limitations: Outcome depends on fragment quality. Direct: original method and metamodel abstracts. Inference: metrics.